Cargando…
Multi-turn losses and cleaning in 2011 and 2012
LHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct hierarchy ensures maximal cleaning efficiency and machine protection. The operational collimator positions are established from the beam centres and sizes at each collimator measured in beam-based ali...
Autores principales: | Valentino, G, Assmann, R W, Bellodi, G, Bruce, R, Burkart, F, Cauchi, M, Deboy, D, Jowett, J M, Lari, L, Redaelli, S, Rossi, A, Salvachua Ferrando, B, Wollmann, D |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1975493 |
Ejemplares similares
-
Collimation settings and performance in 2011 and 2012
por: Bruce, R, et al.
Publicado: (2012) -
IR3 combined cleaning test at 3.5 TeV
por: Assmann, R, et al.
Publicado: (2011) -
Tests of tight collimator settings in the LHC
por: Assmann, R, et al.
Publicado: (2012) -
LHC collimation cleaning and operation outlook
por: Salvachua, B, et al.
Publicado: (2012) -
Cleaning Performance of the LHC Collimation System up to 4 Tev
por: Salvachua, B, et al.
Publicado: (2013)