Cargando…

Beam instrumentation performance overview

The 2011 run has proven that LHC can operate safely and stably with higher bunch intensity and smaller transverse emittance than foreseen in the Technical Design Report. In this presentation the performance of the Beam Position Monitoring (BPM) system is discussed. The improvements to the system, th...

Descripción completa

Detalles Bibliográficos
Autor principal: Sapinski, M
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1975496

Ejemplares similares