Cargando…

The LHC RF–2011 and beyond

The RF system performance in 2011 is presented, with statistics on the High Level faults. The few debunching events are explained. The changes to the RF parameters with respect to the previous run are reviewed . The survival of the RF to a klystron trip is studied: when half nominal current was reac...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Mastoridis, T
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1975497
_version_ 1780945088026771456
author Baudrenghien, P
Mastoridis, T
author_facet Baudrenghien, P
Mastoridis, T
author_sort Baudrenghien, P
collection CERN
description The RF system performance in 2011 is presented, with statistics on the High Level faults. The few debunching events are explained. The changes to the RF parameters with respect to the previous run are reviewed . The survival of the RF to a klystron trip is studied: when half nominal current was reached in June 2011, a klystron trip was linked to the beam dump to prevent the beam circulating in the idling cavity from damaging the cavity and RF load. The action of the longitudinal blow - up on the beam current spectrum (or average longitudinal bunch profile) is shown for both protons and lead ions . The operation at 4 TeV and above is considered. Finally, a proposal for 25 ns operation and nominal beam current is presented.
id cern-1975497
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-19754972022-08-10T20:42:58Zhttp://cds.cern.ch/record/1975497engBaudrenghien, PMastoridis, TThe LHC RF–2011 and beyondAccelerators and Storage RingsThe RF system performance in 2011 is presented, with statistics on the High Level faults. The few debunching events are explained. The changes to the RF parameters with respect to the previous run are reviewed . The survival of the RF to a klystron trip is studied: when half nominal current was reached in June 2011, a klystron trip was linked to the beam dump to prevent the beam circulating in the idling cavity from damaging the cavity and RF load. The action of the longitudinal blow - up on the beam current spectrum (or average longitudinal bunch profile) is shown for both protons and lead ions . The operation at 4 TeV and above is considered. Finally, a proposal for 25 ns operation and nominal beam current is presented.oai:cds.cern.ch:19754972012
spellingShingle Accelerators and Storage Rings
Baudrenghien, P
Mastoridis, T
The LHC RF–2011 and beyond
title The LHC RF–2011 and beyond
title_full The LHC RF–2011 and beyond
title_fullStr The LHC RF–2011 and beyond
title_full_unstemmed The LHC RF–2011 and beyond
title_short The LHC RF–2011 and beyond
title_sort lhc rf–2011 and beyond
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1975497
work_keys_str_mv AT baudrenghienp thelhcrf2011andbeyond
AT mastoridist thelhcrf2011andbeyond
AT baudrenghienp lhcrf2011andbeyond
AT mastoridist lhcrf2011andbeyond