Implications of higher energy - summary of benefits, issues, commissioning cost, SEU, Cryo, QPS margins, Potential availability issues

The LHC is technically almost ready to run at 4 TeV per beam in 2012. Nevertheless, a review of the advantages and disadvantages of such an energy step should be carefully made before taking this decision. There fore, this paper will summarize the benefits from the physics point of view; the potenti...

Descripción completa

Detalles Bibliográficos
Autor principal: Alemany, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1975510
Descripción
Sumario:The LHC is technically almost ready to run at 4 TeV per beam in 2012. Nevertheless, a review of the advantages and disadvantages of such an energy step should be carefully made before taking this decision. There fore, this paper will summarize the benefits from the physics point of view; the potential issues like a possible increase of Single Event Errors , Unidentified Flying Objects, or a significant decrease of the quench margin from beam losses that, all in all , could lead to availability issues, compromising the integrated luminosity. And last but not least, the commissioning cost will be addressed.