Cargando…
Implications of higher energy - summary of benefits, issues, commissioning cost, SEU, Cryo, QPS margins, Potential availability issues
The LHC is technically almost ready to run at 4 TeV per beam in 2012. Nevertheless, a review of the advantages and disadvantages of such an energy step should be carefully made before taking this decision. There fore, this paper will summarize the benefits from the physics point of view; the potenti...
Autor principal: | Alemany, R |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1975510 |
Ejemplares similares
-
QPS Upgrade and Re-commissioning
por: Denz, R
Publicado: (2009) -
Summary: Other issues affecting beam commissioning
por: Russenschuck, Stephan, et al.
Publicado: (2005) -
Machine protection issues affecting beam commissioning summary
por: Schmidt, R
Publicado: (2005) -
Summary: Machine Protection Issues Affecting Beam Commissioning
por: Schmidt, R, et al.
Publicado: (2006) -
Summary of session 7: Magnet issues affecting beam commissioning
por: Koutchouk, Jean-Pierre, et al.
Publicado: (2005)