Cargando…

First thoughts on MD priorities for 2012

In 2012, 22 days of beam time will be allocated for LHC MDs. In this paper, after recalling the 2011 LHC MD experience, the MD rrequests for 2012 are reviewed. Three primary MD themes for 2012 can be identified: 1)pushing performance in 2012, 2)preparing for 2014/15, and 3)towards maximum luminosity...

Descripción completa

Detalles Bibliográficos
Autores principales: Zimmermann, F, Papotti, G, Assmann, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1975511
_version_ 1780945090189983744
author Zimmermann, F
Papotti, G
Assmann, R
author_facet Zimmermann, F
Papotti, G
Assmann, R
author_sort Zimmermann, F
collection CERN
description In 2012, 22 days of beam time will be allocated for LHC MDs. In this paper, after recalling the 2011 LHC MD experience, the MD rrequests for 2012 are reviewed. Three primary MD themes for 2012 can be identified: 1)pushing performance in 2012, 2)preparing for 2014/15, and 3)towards maximum luminosity. Example topics include emittance growth in collision or enhanced satellites for theme 1), 25 ns operation for 2), and ATS optics for 3). Structures lists of MD requests and topics for each theme as well as some initial thoughts on the MD priorities are presented. For certain topics, "start-of-fill MDs" are proposed in order to most efficiently use of the available beam time.
id cern-1975511
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-19755112022-08-10T20:53:05Zhttp://cds.cern.ch/record/1975511engZimmermann, FPapotti, GAssmann, RFirst thoughts on MD priorities for 2012Accelerators and Storage RingsIn 2012, 22 days of beam time will be allocated for LHC MDs. In this paper, after recalling the 2011 LHC MD experience, the MD rrequests for 2012 are reviewed. Three primary MD themes for 2012 can be identified: 1)pushing performance in 2012, 2)preparing for 2014/15, and 3)towards maximum luminosity. Example topics include emittance growth in collision or enhanced satellites for theme 1), 25 ns operation for 2), and ATS optics for 3). Structures lists of MD requests and topics for each theme as well as some initial thoughts on the MD priorities are presented. For certain topics, "start-of-fill MDs" are proposed in order to most efficiently use of the available beam time.oai:cds.cern.ch:19755112012
spellingShingle Accelerators and Storage Rings
Zimmermann, F
Papotti, G
Assmann, R
First thoughts on MD priorities for 2012
title First thoughts on MD priorities for 2012
title_full First thoughts on MD priorities for 2012
title_fullStr First thoughts on MD priorities for 2012
title_full_unstemmed First thoughts on MD priorities for 2012
title_short First thoughts on MD priorities for 2012
title_sort first thoughts on md priorities for 2012
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1975511
work_keys_str_mv AT zimmermannf firstthoughtsonmdprioritiesfor2012
AT papottig firstthoughtsonmdprioritiesfor2012
AT assmannr firstthoughtsonmdprioritiesfor2012