Post LS1 schedule

The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session....

Descripción completa

Detalles Bibliográficos
Autor principal: Lamont, M
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006.13
http://cds.cern.ch/record/1977349
Descripción
Sumario:The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.