Cargando…
Post LS1 schedule
The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session....
Autor principal: | Lamont, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2014-006.13 http://cds.cern.ch/record/1977349 |
Ejemplares similares
-
Wrap-up and prospects for post LS1 operations
por: Lamont, M
Publicado: (2012) -
Availabilty for post-LS1 operation
por: Apollonio, A, et al.
Publicado: (2014) -
Collimation system post-LS1: status and commissioning
por: Salvachua, B, et al.
Publicado: (2014) -
Experiments requirements and limitations for post LS1 operation
por: Gorini, B, et al.
Publicado: (2012) -
Detector Plans for LS1
por: Nessi, M
Publicado: (2012)