What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?

Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic consolidation works that will be needed to maintain design performance of the LHC and its Injector chain until 2035, with an overall reliability as good as that achieved in the first LHC operation period 2...

Descripción completa

Detalles Bibliográficos
Autores principales: Baird, S, Foraz , K
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006.31
http://cds.cern.ch/record/1977352
_version_ 1780945163081744384
author Baird, S
Foraz , K
author_facet Baird, S
Foraz , K
author_sort Baird, S
collection CERN
description Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic consolidation works that will be needed to maintain design performance of the LHC and its Injector chain until 2035, with an overall reliability as good as that achieved in the first LHC operation period 2009 to 2013. Using these data we will estimate the shutdown schedule needed throughout this period to complete these maintenance and consolidation works. These estimates will also include the required radiation cool-down periods, time for system re-commissioning and testing as well as the time needed to restart the accelerator chain for LHC colliding beam operation. As some of the consolidation activities needed for the PS and SPS machines are related to the radia tion dose taken by the machine equipment (e.g., irradiated cable replacement and magnet renovation) the variation of these time estimates as a function of beam losses in the Injector chain will also be covered.
id cern-1977352
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling cern-19773522022-08-10T20:27:15Zdoi:10.5170/CERN-2014-006.31http://cds.cern.ch/record/1977352engBaird, SForaz , KWhat are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?Accelerators and Storage RingsAssuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic consolidation works that will be needed to maintain design performance of the LHC and its Injector chain until 2035, with an overall reliability as good as that achieved in the first LHC operation period 2009 to 2013. Using these data we will estimate the shutdown schedule needed throughout this period to complete these maintenance and consolidation works. These estimates will also include the required radiation cool-down periods, time for system re-commissioning and testing as well as the time needed to restart the accelerator chain for LHC colliding beam operation. As some of the consolidation activities needed for the PS and SPS machines are related to the radia tion dose taken by the machine equipment (e.g., irradiated cable replacement and magnet renovation) the variation of these time estimates as a function of beam losses in the Injector chain will also be covered.CERNoai:cds.cern.ch:19773522014
spellingShingle Accelerators and Storage Rings
Baird, S
Foraz , K
What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title_full What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title_fullStr What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title_full_unstemmed What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title_short What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
title_sort what are the required maintenance and consolidation activities to run at design performance levels (injectors and lhc) until 2035?
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2014-006.31
http://cds.cern.ch/record/1977352
work_keys_str_mv AT bairds whataretherequiredmaintenanceandconsolidationactivitiestorunatdesignperformancelevelsinjectorsandlhcuntil2035
AT forazk whataretherequiredmaintenanceandconsolidationactivitiestorunatdesignperformancelevelsinjectorsandlhcuntil2035