Cargando…

What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?

Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic consolidation works that will be needed to maintain design performance of the LHC and its Injector chain until 2035, with an overall reliability as good as that achieved in the first LHC operation period 2...

Descripción completa

Detalles Bibliográficos
Autores principales: Baird, S, Foraz , K
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006.31
http://cds.cern.ch/record/1977352

Ejemplares similares