Cargando…
US1: what do we gain in beam performance
The Upgrade Scenario 1 (US1) of the Review of the LIU and LHC Upgrade (RLIU) plans aims at a yearly int egrated luminosity of ca. 170 fb$^{- 1}$ assuming a total of 160 scheduled operation days for luminosity production and a total of 2000 fb$^{- 1}$ over a period of 10 years of operation starting w...
Autores principales: | Arduini, G, Bartosik , H, Bruce, R, Brüning, O, Damerau, H, De Maria, R, Fartoukh, S, Fitterer, M, Gilardoni, S, Giovannozzi, M, Gorini, B, Lamont, M, Metral, E, Mounet , N, Redaelli, S, Rossi, L, Rumolo, G |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2014-006.57 http://cds.cern.ch/record/1977357 |
Ejemplares similares
-
PICs: what do we gain in beam performance
por: Arduini, G, et al.
Publicado: (2014) -
How to maximize the HL-LHC performance
por: Arduini, G, et al.
Publicado: (2014) -
“How to maximize the HL-LHC performance (HL-LHC)?”
por: Arduini, G, et al.
Publicado: (2014) -
The High Luminosity Challenge: potential and limitations of High Intensity High Brightness in the LHC and its injectors
por: De Maria, R, et al.
Publicado: (2014) -
Baseline LHC machine parameters and configuration of the 2015 proton run
por: Bruce, R., et al.
Publicado: (2014)