How to implement all HL-LHC upgrades
The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start a...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2014-006.105 http://cds.cern.ch/record/1977363 |
_version_ | 1780945165210353664 |
---|---|
author | Rossi, L Arduini, G Ballarino, A Brüning, O Jensen, E Redaelli, S Tavian, L Todesco, E |
author_facet | Rossi, L Arduini, G Ballarino, A Brüning, O Jensen, E Redaelli, S Tavian, L Todesco, E |
author_sort | Rossi, L |
collection | CERN |
description | The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation. |
id | cern-1977363 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
publisher | CERN |
record_format | invenio |
spelling | cern-19773632022-08-10T20:06:37Zdoi:10.5170/CERN-2014-006.105http://cds.cern.ch/record/1977363engRossi, LArduini, GBallarino, ABrüning, OJensen, ERedaelli, STavian, LTodesco, EHow to implement all HL-LHC upgradesAccelerators and Storage RingsThe luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation.CERNoai:cds.cern.ch:19773632014 |
spellingShingle | Accelerators and Storage Rings Rossi, L Arduini, G Ballarino, A Brüning, O Jensen, E Redaelli, S Tavian, L Todesco, E How to implement all HL-LHC upgrades |
title | How to implement all HL-LHC upgrades |
title_full | How to implement all HL-LHC upgrades |
title_fullStr | How to implement all HL-LHC upgrades |
title_full_unstemmed | How to implement all HL-LHC upgrades |
title_short | How to implement all HL-LHC upgrades |
title_sort | how to implement all hl-lhc upgrades |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2014-006.105 http://cds.cern.ch/record/1977363 |
work_keys_str_mv | AT rossil howtoimplementallhllhcupgrades AT arduinig howtoimplementallhllhcupgrades AT ballarinoa howtoimplementallhllhcupgrades AT bruningo howtoimplementallhllhcupgrades AT jensene howtoimplementallhllhcupgrades AT redaellis howtoimplementallhllhcupgrades AT tavianl howtoimplementallhllhcupgrades AT todescoe howtoimplementallhllhcupgrades |