How to implement all HL-LHC upgrades

The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start a...

Descripción completa

Detalles Bibliográficos
Autores principales: Rossi, L, Arduini, G, Ballarino, A, Brüning, O, Jensen, E, Redaelli, S, Tavian, L, Todesco, E
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006.105
http://cds.cern.ch/record/1977363
_version_ 1780945165210353664
author Rossi, L
Arduini, G
Ballarino, A
Brüning, O
Jensen, E
Redaelli, S
Tavian, L
Todesco, E
author_facet Rossi, L
Arduini, G
Ballarino, A
Brüning, O
Jensen, E
Redaelli, S
Tavian, L
Todesco, E
author_sort Rossi, L
collection CERN
description The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation.
id cern-1977363
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling cern-19773632022-08-10T20:06:37Zdoi:10.5170/CERN-2014-006.105http://cds.cern.ch/record/1977363engRossi, LArduini, GBallarino, ABrüning, OJensen, ERedaelli, STavian, LTodesco, EHow to implement all HL-LHC upgradesAccelerators and Storage RingsThe luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation.CERNoai:cds.cern.ch:19773632014
spellingShingle Accelerators and Storage Rings
Rossi, L
Arduini, G
Ballarino, A
Brüning, O
Jensen, E
Redaelli, S
Tavian, L
Todesco, E
How to implement all HL-LHC upgrades
title How to implement all HL-LHC upgrades
title_full How to implement all HL-LHC upgrades
title_fullStr How to implement all HL-LHC upgrades
title_full_unstemmed How to implement all HL-LHC upgrades
title_short How to implement all HL-LHC upgrades
title_sort how to implement all hl-lhc upgrades
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2014-006.105
http://cds.cern.ch/record/1977363
work_keys_str_mv AT rossil howtoimplementallhllhcupgrades
AT arduinig howtoimplementallhllhcupgrades
AT ballarinoa howtoimplementallhllhcupgrades
AT bruningo howtoimplementallhllhcupgrades
AT jensene howtoimplementallhllhcupgrades
AT redaellis howtoimplementallhllhcupgrades
AT tavianl howtoimplementallhllhcupgrades
AT todescoe howtoimplementallhllhcupgrades