Cargando…

Summary of session 4 upgrade scenario 2

The performance target for Upgrade Scenario 2 (US2) was defined for the purposes of the RLIUP meeting as accumulating 3000 fb−1 in the years to 2035. As shown earlier in the meeting, this sets the requirement for 270 fb−1 per year of operation after LS3. The presentations in Session 4 were arranged...

Descripción completa

Detalles Bibliográficos
Autores principales: Garoby, R, Goddard, B
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006.195
http://cds.cern.ch/record/1977375
_version_ 1780945167739518976
author Garoby, R
Goddard, B
author_facet Garoby, R
Goddard, B
author_sort Garoby, R
collection CERN
description The performance target for Upgrade Scenario 2 (US2) was defined for the purposes of the RLIUP meeting as accumulating 3000 fb−1 in the years to 2035. As shown earlier in the meeting, this sets the requirement for 270 fb−1 per year of operation after LS3. The presentations in Session 4 were arranged to evaluate the performance of HLLHC given the assumed baseline upgrade path, to present the optimum beam parameters in collision and from the injectors, to evaluate whether the injectors could reach the required parameters in view of the LIU upgrades, and to then investigate possible alternative (i.e. non-baseline) ideas or possibilities for improving the performance reach of HLLHC and its injector chain. The session concluded with two talks, one on the challenges and outlook for improving the achieved physics availability of HL-LHC, and the second on the analysis of the possible issues with the baseline 25 ns bunch spacing and the estimate of the performance potential with the alternative option of 50 ns.
id cern-1977375
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling cern-19773752022-08-10T20:27:17Zdoi:10.5170/CERN-2014-006.195http://cds.cern.ch/record/1977375engGaroby, RGoddard, BSummary of session 4 upgrade scenario 2Accelerators and Storage RingsThe performance target for Upgrade Scenario 2 (US2) was defined for the purposes of the RLIUP meeting as accumulating 3000 fb−1 in the years to 2035. As shown earlier in the meeting, this sets the requirement for 270 fb−1 per year of operation after LS3. The presentations in Session 4 were arranged to evaluate the performance of HLLHC given the assumed baseline upgrade path, to present the optimum beam parameters in collision and from the injectors, to evaluate whether the injectors could reach the required parameters in view of the LIU upgrades, and to then investigate possible alternative (i.e. non-baseline) ideas or possibilities for improving the performance reach of HLLHC and its injector chain. The session concluded with two talks, one on the challenges and outlook for improving the achieved physics availability of HL-LHC, and the second on the analysis of the possible issues with the baseline 25 ns bunch spacing and the estimate of the performance potential with the alternative option of 50 ns.CERNoai:cds.cern.ch:19773752014
spellingShingle Accelerators and Storage Rings
Garoby, R
Goddard, B
Summary of session 4 upgrade scenario 2
title Summary of session 4 upgrade scenario 2
title_full Summary of session 4 upgrade scenario 2
title_fullStr Summary of session 4 upgrade scenario 2
title_full_unstemmed Summary of session 4 upgrade scenario 2
title_short Summary of session 4 upgrade scenario 2
title_sort summary of session 4 upgrade scenario 2
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2014-006.195
http://cds.cern.ch/record/1977375
work_keys_str_mv AT garobyr summaryofsession4upgradescenario2
AT goddardb summaryofsession4upgradescenario2