Cargando…
Abort Gap Cleaning for LHC Run 2
To minimise the beam losses at the moment of an LHC beam dump the 3 μs long abort gap should contain as few particles as possible. Its population can be minimised by abort gap cleaning using the LHC transverse damper system. The LHC Run 1 experience is briefly recalled; changes foreseen for the LHC...
Autores principales: | Uythoven, J, Boccardi, A, Bravin, E, Goddard, B, Hemelsoet, GH, Höfle, W, Jacquet, D, Kain, V, Mazzoni, S, Meddahi, M, Valuch, D |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1982274 |
Ejemplares similares
-
Abort Gap Cleaning for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2014) -
LHC Abort Gap Monitoring and Cleaning
por: Meddahi, M, et al.
Publicado: (2010) -
LHC abort gap cleaning studies during luminosity operation
por: Bartmann, W, et al.
Publicado: (2012) -
Abort Gap Cleaning tests performed on 13 October 2011 during luminosity operation
por: Boccardi, A, et al.
Publicado: (2012) -
Summary of Abort Gap cleaning tests performed at 3.5 TeV on October,7 2011
por: Boccardi, A, et al.
Publicado: (2011)