Cargando…
Commissioning of new facility equipment
Autores principales: | B.Gkotse, B., Glaser, M., Lima, P., Matli, E., Moll, M., Ravotti, F., French, R., Beck, G., Gaubas, E., Vaitkus, J., Čeponis, T., Tekorius, A., Pavlov, J., Meškauskaitė, D., Uleckas, A. |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1982441 |
Ejemplares similares
-
A New High-intensity Proton Irradiation Facility at the CERN PS East Area
por: Gkotse, B, et al.
Publicado: (2014) -
Installation of infrastructure
por: Casse, G., et al.
Publicado: (2015) -
Upgrade scenarios for irradiation lines:: Upgrade of the Proton Irradiation Facility in the CERN PS EAST AREA
por: Ravotti, F., et al.
Publicado: (2014) -
Installation of new equipment: Movable irradiation tables operational
por: Glaser, M, et al.
Publicado: (2013) -
Dosimetry of background irradiations of accelerators based on hadrons fluence dependent carrier lifetime measurements
por: Tekorius, A
Publicado: (2015)