Cargando…
Performance of beamline and infrastructure
Autores principales: | Andreotti, M., Buonomo, B., Bizzarri, M., Calabrese, R., Cecchi, C., Claps, G., Corradi, G., Denni, U., Eigen, G., Foggetta, L., Frani, M. A., Lubrano, P., Manoni, E., Mazzitelli, G., Murtas, F., Papalino, G., Papi, A., Rossi, A., Scolieri, G., Tagnani, D. |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1983581 |
Ejemplares similares
-
Remote test bench equipped with service movable platoform in two axis: Manual instruction and warnings
por: B. Buonomo, U. Denni, L. Foggetta, M. A. Frani, G. Mazzitelli, G. Papalino
Publicado: (2012) -
Experimental and numerical characterization of the neutron field produced in the n@BTF Frascati photo-neutron source
por: Bedogni, R., et al.
Publicado: (2011) -
Milestone Report: Specification fo Beamline Fixed: Milestone: MS27
por: Blondel, A, et al.
Publicado: (2012) -
Characterization of a tagged $\gamma$-ray beam line at the DAFNE Beam Test Facility
por: Cattaneo, P W, et al.
Publicado: (2012) -
Design study of a low-energy extension of the H8 beam-line at the CERN Super Proton Synchrotron
por: Turner, M
Publicado: (2014)