Cargando…
L1 calorimeter trigger upgrade: electron and photon performance
After the first long shutdown the LHC will restart in 2015, and instantaneous luminosity greater than $10^{34}$ cm$^{-2}$ s$^{-1}$ and an average number of pile-up events of 45 or higher could be achieved. To avoid a significant increase in energy thresholds, which would be detrimental for physics,...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1987288 |
Ejemplares similares
-
L1 calorimeter trigger upgrade: tau performance
por: CMS Collaboration
Publicado: (2015) -
Performance of the Stage 1 Calorimeter Trigger Upgrade
por: CMS Collaboration
Publicado: (2015) -
L1 calorimeter trigger upgrade: jet and energy sum performance and commissioning status
por: CMS Collaboration
Publicado: (2015) -
CMS L1 Calorimeter Trigger performance in 2016 data
por: CMS Collaboration
Publicado: (2016) -
Level-1 Electron and Photon trigger performance in 2016 data
por: CMS Collaboration
Publicado: (2016)