Cargando…
Proposal for SPS beam time for the baby MIND and TASD neutrino detector prototypes
The design, construction and testing of neutrino detector prototypes at CERN are ongoing activities. This document reports on the design of solid state baby MIND and TASD detector prototypes and outlines requirements for a test beam at CERN to test these, tentatively planned on the H8 beamline in th...
Autores principales: | Asfandiyarov, R., Bayes, R., Blondel, A., Bogomilov, M., Bross, A., Cadoux, F., Cervera, A., Izmaylov, A., Karadzhov, Y., Karpikov, I., Khabibulin, M., Khotyantsev, A., Kopylov, A., Kudenko, Y., Matev, R., Mineev, O., Musienko, Y., Nessi, M., Noah, E., Rubbia, A., Shaykiev, A., Soler, P., Tsenov, R., Vankova-Kirilova, G., Yershov, N. |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2002194 |
Ejemplares similares
-
Installation of TASD and MIND
por: Blondel, A., et al.
Publicado: (2014) -
Design of TASD and MIND
por: Noah, Etam, et al.
Publicado: (2012) -
Infrastructure performance and utilization: TASD and MIND are constructed and tested for their performance
por: Noah, E., et al.
Publicado: (2015) -
Detector and detector control system operational: GIF++ Infrastructure Commissioning and Utilization
por: Aielli, G., et al.
Publicado: (2015) -
CERN GIF++ : A new irradiation facility to test large-area particle detectors for the high-luminosity LHC program
por: Jakel, M R, et al.
Publicado: (2014)