Cargando…

Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2

This paper presents the front-end electronics upgrades of the ALICE Time Projection Chamber detector for the coming years, with a focus on the upgrades for Long Shutdown 2. The Large Hadron Collider is currently in Long Shutdown 1 following a successful first run, and upgrades of the detectors are u...

Descripción completa

Detalles Bibliográficos
Autor principal: Velure, Arild
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TNS.2014.2382332
https://dx.doi.org/10.1109/RTC.2014.7097489
http://cds.cern.ch/record/2004407
_version_ 1780946116697653248
author Velure, Arild
author_facet Velure, Arild
author_sort Velure, Arild
collection CERN
description This paper presents the front-end electronics upgrades of the ALICE Time Projection Chamber detector for the coming years, with a focus on the upgrades for Long Shutdown 2. The Large Hadron Collider is currently in Long Shutdown 1 following a successful first run, and upgrades of the detectors are underway to support the higher particle interaction rates planned for the next run. For the Time Projection Chamber, the increase in data due to the higher interaction rate and higher energy will cause a bottleneck in the Readout Control Unit and a new board is in development which increases the data-link speed to the back-end. Another more general upgrade of the ALICE experiment is planned for Long Shutdown 2, foreseen to start in 2018. In this case the goal is to cope with an even higher interaction rate of 50 kHz for Pb-Pb collisions. The present Multi Wire Proportional Chambers of the Time Projection Chamber will then be replaced by Gas Electron Multiplier technology. At the same time, the front-end electronics and readout system will also be replaced.
id cern-2004407
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling cern-20044072022-08-10T13:02:56Zdoi:10.1109/TNS.2014.2382332doi:10.1109/RTC.2014.7097489http://cds.cern.ch/record/2004407engVelure, ArildUpgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2Detectors and Experimental TechniquesThis paper presents the front-end electronics upgrades of the ALICE Time Projection Chamber detector for the coming years, with a focus on the upgrades for Long Shutdown 2. The Large Hadron Collider is currently in Long Shutdown 1 following a successful first run, and upgrades of the detectors are underway to support the higher particle interaction rates planned for the next run. For the Time Projection Chamber, the increase in data due to the higher interaction rate and higher energy will cause a bottleneck in the Readout Control Unit and a new board is in development which increases the data-link speed to the back-end. Another more general upgrade of the ALICE experiment is planned for Long Shutdown 2, foreseen to start in 2018. In this case the goal is to cope with an even higher interaction rate of 50 kHz for Pb-Pb collisions. The present Multi Wire Proportional Chambers of the Time Projection Chamber will then be replaced by Gas Electron Multiplier technology. At the same time, the front-end electronics and readout system will also be replaced.oai:cds.cern.ch:20044072015
spellingShingle Detectors and Experimental Techniques
Velure, Arild
Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title_full Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title_fullStr Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title_full_unstemmed Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title_short Upgrades of the ALICE TPC Front-End Electronics for Long Shutdown 1 and 2
title_sort upgrades of the alice tpc front-end electronics for long shutdown 1 and 2
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1109/TNS.2014.2382332
https://dx.doi.org/10.1109/RTC.2014.7097489
http://cds.cern.ch/record/2004407
work_keys_str_mv AT velurearild upgradesofthealicetpcfrontendelectronicsforlongshutdown1and2