Cargando…

The ATLAS Trigger Core Configuration and Execution System in Light of the ATLAS Upgrade for LHC Run 2

During the 2013/14 shutdown of the Large Hadron Collider (LHC) the ATLAS first level trigger (L1T) and the data acquisition system (DAQ) were substantially upgraded to cope with the increase in luminosity and collision multiplicity, expected to be delivered by the LHC in 2015. To name a few, the L1T...

Descripción completa

Detalles Bibliográficos
Autor principal: Heinrich, Lukas
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2007293

Ejemplares similares