Cargando…
Minimum Bias Trigger Scintillators for ATLAS: Commissioning and Run 2 Initial Operation
The Minimum Bias Trigger Scintillators (MBTS) delivered the primary trigger for selecting events from low luminosity proton-proton, lead-lead and lead-proton collisions with the smallest possible bias during LHC Run 1 (2009-2013). Similarly, the MBTS will select events for the first Run 2 physics me...
Autor principal: | Dano Hoffmann, Maria |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2016948 |
Ejemplares similares
-
Commissioning and Initial Run-2 Operation of the ATLAS Minimum Bias Trigger Scintillators
por: Dano Hoffmann, Maria
Publicado: (2015) -
Minimum Bias Trigger Scintillators in ATLAS Run II
por: Sidoti, A
Publicado: (2014) -
ATLAS Minimum Bias Trigger Scintillator upgrade for LHC RunII
por: Sidoti, A
Publicado: (2014) -
The Hardware Topological Trigger of ATLAS: Commissioning and Operations
por: Simioni, Eduard
Publicado: (2018) -
Study of TileCal scintillator irradiation using the minimum bias integrators
por: Fischer, Cora
Publicado: (2016)