Cargando…
Work on CMS Muon Detector (RPC) during Long Shutdown 1 (LS1) - Point 5, Cessy, CMS cavern
Supermodule Integration
Autor principal: | Pedraza, Isabel |
---|---|
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2017209 |
Ejemplares similares
-
Work on CMS Muon Detector (RPC) during Long Shutdown 1 (LS1) - Point 5, Cessy, CMS cavern
por: Maria Isabel, Pedraza Morales
Publicado: (2015) -
Work on CMS Muon Detector (RPC) during Long Shutdown 1 (LS1) - Point 5, Cessy, CMS cavern
por: Saleh, Muhammad
Publicado: (2015) -
Work on CMS Muon Detector (RPC) during Long Shutdown 1 (LS1) - Point 5, Cessy, CMS cavern
por: Dong Hyun, Kim
Publicado: (2015) -
Work on CMS Muon Detector (RPC) during Long Shutdown 1 (LS1) - Point 5, Cessy, CMS cavern
por: Verwilligen, Piet
Publicado: (2014) -
Work on CMS Muon Detector (CSCs) during Long Shutdown 1 (LS1) - Point 5, Cessy, underground cavern
por: Hoch, Michael
Publicado: (2014)