Cargando…
Improvements to the monitoring system of the KEK 2.5 GeV linac and its performance tests
Autores principales: | Shidara, T, Oogoe, T, Ogawa, Y, Ohsawa, S, Otake, Y, Kakihara, K, Kamikubota, N, Kobayashi, H, Furukawa, K, Enomoto, A, Urano, T, Horikoshi, G |
---|---|
Lenguaje: | eng |
Publicado: |
1990
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/201770 |
Ejemplares similares
-
Re-formation of the PF 2.5-GeV linac to 8 GeV
por: Enomoto, A, et al.
Publicado: (1995) -
Simulation study of beam bunching in the new pre-injector of the KEK 2.5-GeV linac
por: Kamitani, T, et al.
Publicado: (1993) -
Beam-current monitoring system at the KEK electron/positron linac
por: Furukawa, K, et al.
Publicado: (1990) -
Improvement of the alignment system for the KEK 2.5-GeV electron Linac
por: Ogawa, Y, et al.
Publicado: (1996) -
Monitor of seismic vibration for the KEK linac
por: Kamikubota, N, et al.
Publicado: (1995)