Cargando…
Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgr...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/NSSMIC.2014.7431124 http://cds.cern.ch/record/2020874 |
_version_ | 1780946858389012480 |
---|---|
author | Klabbers, Pamela Renee Aggleton, Robin Cameron Baber, Mark David John Barbieri, Richard Alexander Belknap, Donald Austin Berryhill, Jeffrey Brooke, James John Bundock, Aaron Cali, Ivan Amos Cepeda, Maria Luisa Dasgupta, Sudeshna da Silva, J.C Dasu, Sridhara Rao Durkin, Timothy John Fobes, Robert William Ghabrous Larrea, Carlos Gorski, Thomas Grimes, Mark Guilbaud, Maxime Guo, Z Hall, Geoffrey Harder, Kristian Harper, Sam Iles, Gregory Michiel Innocenti, Gian Michele Ives, Sarah Joanne Jones, John Kreis, Benjamin Jonah Lee, Y Li, W Lucas, Christopher Lucas, Robyn Elizabeth Marrouche, Jad Newbold, David Northup, Michael Oljavo, I Paramesvaran, Sudarshan Rivera, Ryan Allen Roland, Christof Rose, A Sankey, D Smith, Wesley Svetek, Ales Tapper, Alexander Thea, Alessandro Tikalsky, Jesra Lilah Uplegger, Lorenzo Vicente, Marcelo Williams, Thomas Stephen Wyslouch, Boleslaw |
author_facet | Klabbers, Pamela Renee Aggleton, Robin Cameron Baber, Mark David John Barbieri, Richard Alexander Belknap, Donald Austin Berryhill, Jeffrey Brooke, James John Bundock, Aaron Cali, Ivan Amos Cepeda, Maria Luisa Dasgupta, Sudeshna da Silva, J.C Dasu, Sridhara Rao Durkin, Timothy John Fobes, Robert William Ghabrous Larrea, Carlos Gorski, Thomas Grimes, Mark Guilbaud, Maxime Guo, Z Hall, Geoffrey Harder, Kristian Harper, Sam Iles, Gregory Michiel Innocenti, Gian Michele Ives, Sarah Joanne Jones, John Kreis, Benjamin Jonah Lee, Y Li, W Lucas, Christopher Lucas, Robyn Elizabeth Marrouche, Jad Newbold, David Northup, Michael Oljavo, I Paramesvaran, Sudarshan Rivera, Ryan Allen Roland, Christof Rose, A Sankey, D Smith, Wesley Svetek, Ales Tapper, Alexander Thea, Alessandro Tikalsky, Jesra Lilah Uplegger, Lorenzo Vicente, Marcelo Williams, Thomas Stephen Wyslouch, Boleslaw |
author_sort | Klabbers, Pamela Renee |
collection | CERN |
description | The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for a fully upgraded CMS calorimeter trigger in operation by 2016.Solenoid (CMS) experiment is currently installing an upgrade to their Calorimeter Trigger to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised by these challenging conditions. The electronics will be upgraded in two stages. Stage-1 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before Stage-2 can be fully installed. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system, and require that the updates to the calorimeter back-ends, the source of the trigger primitives, are completed. The new systemâ??s boards will utilize Xilinx Virtex 7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for an fully upgraded CMS calorimeter trigger in operation by 2016. |
id | cern-2020874 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | cern-20208742019-09-30T06:29:59Zdoi:10.1109/NSSMIC.2014.7431124http://cds.cern.ch/record/2020874engKlabbers, Pamela ReneeAggleton, Robin CameronBaber, Mark David JohnBarbieri, Richard AlexanderBelknap, Donald AustinBerryhill, JeffreyBrooke, James JohnBundock, AaronCali, Ivan AmosCepeda, Maria LuisaDasgupta, Sudeshnada Silva, J.CDasu, Sridhara RaoDurkin, Timothy JohnFobes, Robert WilliamGhabrous Larrea, CarlosGorski, ThomasGrimes, MarkGuilbaud, MaximeGuo, ZHall, GeoffreyHarder, KristianHarper, SamIles, Gregory MichielInnocenti, Gian MicheleIves, Sarah JoanneJones, JohnKreis, Benjamin JonahLee, YLi, WLucas, ChristopherLucas, Robyn ElizabethMarrouche, JadNewbold, DavidNorthup, MichaelOljavo, IParamesvaran, SudarshanRivera, Ryan AllenRoland, ChristofRose, ASankey, DSmith, WesleySvetek, AlesTapper, AlexanderThea, AlessandroTikalsky, Jesra LilahUplegger, LorenzoVicente, MarceloWilliams, Thomas StephenWyslouch, BoleslawInstallation and Commissioning of the CMS Level-1 Calorimeter Trigger UpgradeDetectors and Experimental TechniquesThe Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for a fully upgraded CMS calorimeter trigger in operation by 2016.Solenoid (CMS) experiment is currently installing an upgrade to their Calorimeter Trigger to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised by these challenging conditions. The electronics will be upgraded in two stages. Stage-1 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before Stage-2 can be fully installed. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system, and require that the updates to the calorimeter back-ends, the source of the trigger primitives, are completed. The new systemâ??s boards will utilize Xilinx Virtex 7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for an fully upgraded CMS calorimeter trigger in operation by 2016.CMS-CR-2014-423oai:cds.cern.ch:20208742014-11-26 |
spellingShingle | Detectors and Experimental Techniques Klabbers, Pamela Renee Aggleton, Robin Cameron Baber, Mark David John Barbieri, Richard Alexander Belknap, Donald Austin Berryhill, Jeffrey Brooke, James John Bundock, Aaron Cali, Ivan Amos Cepeda, Maria Luisa Dasgupta, Sudeshna da Silva, J.C Dasu, Sridhara Rao Durkin, Timothy John Fobes, Robert William Ghabrous Larrea, Carlos Gorski, Thomas Grimes, Mark Guilbaud, Maxime Guo, Z Hall, Geoffrey Harder, Kristian Harper, Sam Iles, Gregory Michiel Innocenti, Gian Michele Ives, Sarah Joanne Jones, John Kreis, Benjamin Jonah Lee, Y Li, W Lucas, Christopher Lucas, Robyn Elizabeth Marrouche, Jad Newbold, David Northup, Michael Oljavo, I Paramesvaran, Sudarshan Rivera, Ryan Allen Roland, Christof Rose, A Sankey, D Smith, Wesley Svetek, Ales Tapper, Alexander Thea, Alessandro Tikalsky, Jesra Lilah Uplegger, Lorenzo Vicente, Marcelo Williams, Thomas Stephen Wyslouch, Boleslaw Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title | Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title_full | Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title_fullStr | Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title_full_unstemmed | Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title_short | Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade |
title_sort | installation and commissioning of the cms level-1 calorimeter trigger upgrade |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1109/NSSMIC.2014.7431124 http://cds.cern.ch/record/2020874 |
work_keys_str_mv | AT klabberspamelarenee installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT aggletonrobincameron installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT babermarkdavidjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT barbieririchardalexander installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT belknapdonaldaustin installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT berryhilljeffrey installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT brookejamesjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT bundockaaron installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT caliivanamos installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT cepedamarialuisa installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT dasguptasudeshna installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT dasilvajc installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT dasusridhararao installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT durkintimothyjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT fobesrobertwilliam installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT ghabrouslarreacarlos installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT gorskithomas installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT grimesmark installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT guilbaudmaxime installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT guoz installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT hallgeoffrey installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT harderkristian installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT harpersam installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT ilesgregorymichiel installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT innocentigianmichele installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT ivessarahjoanne installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT jonesjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT kreisbenjaminjonah installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT leey installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT liw installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT lucaschristopher installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT lucasrobynelizabeth installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT marrouchejad installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT newbolddavid installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT northupmichael installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT oljavoi installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT paramesvaransudarshan installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT riveraryanallen installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT rolandchristof installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT rosea installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT sankeyd installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT smithwesley installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT svetekales installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT tapperalexander installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT theaalessandro installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT tikalskyjesralilah installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT upleggerlorenzo installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT vicentemarcelo installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT williamsthomasstephen installationandcommissioningofthecmslevel1calorimetertriggerupgrade AT wyslouchboleslaw installationandcommissioningofthecmslevel1calorimetertriggerupgrade |