Cargando…

Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade

The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgr...

Descripción completa

Detalles Bibliográficos
Autores principales: Klabbers, Pamela Renee, Aggleton, Robin Cameron, Baber, Mark David John, Barbieri, Richard Alexander, Belknap, Donald Austin, Berryhill, Jeffrey, Brooke, James John, Bundock, Aaron, Cali, Ivan Amos, Cepeda, Maria Luisa, Dasgupta, Sudeshna, da Silva, J.C, Dasu, Sridhara Rao, Durkin, Timothy John, Fobes, Robert William, Ghabrous Larrea, Carlos, Gorski, Thomas, Grimes, Mark, Guilbaud, Maxime, Guo, Z, Hall, Geoffrey, Harder, Kristian, Harper, Sam, Iles, Gregory Michiel, Innocenti, Gian Michele, Ives, Sarah Joanne, Jones, John, Kreis, Benjamin Jonah, Lee, Y, Li, W, Lucas, Christopher, Lucas, Robyn Elizabeth, Marrouche, Jad, Newbold, David, Northup, Michael, Oljavo, I, Paramesvaran, Sudarshan, Rivera, Ryan Allen, Roland, Christof, Rose, A, Sankey, D, Smith, Wesley, Svetek, Ales, Tapper, Alexander, Thea, Alessandro, Tikalsky, Jesra Lilah, Uplegger, Lorenzo, Vicente, Marcelo, Williams, Thomas Stephen, Wyslouch, Boleslaw
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1109/NSSMIC.2014.7431124
http://cds.cern.ch/record/2020874
_version_ 1780946858389012480
author Klabbers, Pamela Renee
Aggleton, Robin Cameron
Baber, Mark David John
Barbieri, Richard Alexander
Belknap, Donald Austin
Berryhill, Jeffrey
Brooke, James John
Bundock, Aaron
Cali, Ivan Amos
Cepeda, Maria Luisa
Dasgupta, Sudeshna
da Silva, J.C
Dasu, Sridhara Rao
Durkin, Timothy John
Fobes, Robert William
Ghabrous Larrea, Carlos
Gorski, Thomas
Grimes, Mark
Guilbaud, Maxime
Guo, Z
Hall, Geoffrey
Harder, Kristian
Harper, Sam
Iles, Gregory Michiel
Innocenti, Gian Michele
Ives, Sarah Joanne
Jones, John
Kreis, Benjamin Jonah
Lee, Y
Li, W
Lucas, Christopher
Lucas, Robyn Elizabeth
Marrouche, Jad
Newbold, David
Northup, Michael
Oljavo, I
Paramesvaran, Sudarshan
Rivera, Ryan Allen
Roland, Christof
Rose, A
Sankey, D
Smith, Wesley
Svetek, Ales
Tapper, Alexander
Thea, Alessandro
Tikalsky, Jesra Lilah
Uplegger, Lorenzo
Vicente, Marcelo
Williams, Thomas Stephen
Wyslouch, Boleslaw
author_facet Klabbers, Pamela Renee
Aggleton, Robin Cameron
Baber, Mark David John
Barbieri, Richard Alexander
Belknap, Donald Austin
Berryhill, Jeffrey
Brooke, James John
Bundock, Aaron
Cali, Ivan Amos
Cepeda, Maria Luisa
Dasgupta, Sudeshna
da Silva, J.C
Dasu, Sridhara Rao
Durkin, Timothy John
Fobes, Robert William
Ghabrous Larrea, Carlos
Gorski, Thomas
Grimes, Mark
Guilbaud, Maxime
Guo, Z
Hall, Geoffrey
Harder, Kristian
Harper, Sam
Iles, Gregory Michiel
Innocenti, Gian Michele
Ives, Sarah Joanne
Jones, John
Kreis, Benjamin Jonah
Lee, Y
Li, W
Lucas, Christopher
Lucas, Robyn Elizabeth
Marrouche, Jad
Newbold, David
Northup, Michael
Oljavo, I
Paramesvaran, Sudarshan
Rivera, Ryan Allen
Roland, Christof
Rose, A
Sankey, D
Smith, Wesley
Svetek, Ales
Tapper, Alexander
Thea, Alessandro
Tikalsky, Jesra Lilah
Uplegger, Lorenzo
Vicente, Marcelo
Williams, Thomas Stephen
Wyslouch, Boleslaw
author_sort Klabbers, Pamela Renee
collection CERN
description The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for a fully upgraded CMS calorimeter trigger in operation by 2016.Solenoid (CMS) experiment is currently installing an upgrade to their Calorimeter Trigger to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised by these challenging conditions. The electronics will be upgraded in two stages. Stage-1 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before Stage-2 can be fully installed. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system, and require that the updates to the calorimeter back-ends, the source of the trigger primitives, are completed. The new systemâ??s boards will utilize Xilinx Virtex 7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for an fully upgraded CMS calorimeter trigger in operation by 2016.
id cern-2020874
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-20208742019-09-30T06:29:59Zdoi:10.1109/NSSMIC.2014.7431124http://cds.cern.ch/record/2020874engKlabbers, Pamela ReneeAggleton, Robin CameronBaber, Mark David JohnBarbieri, Richard AlexanderBelknap, Donald AustinBerryhill, JeffreyBrooke, James JohnBundock, AaronCali, Ivan AmosCepeda, Maria LuisaDasgupta, Sudeshnada Silva, J.CDasu, Sridhara RaoDurkin, Timothy JohnFobes, Robert WilliamGhabrous Larrea, CarlosGorski, ThomasGrimes, MarkGuilbaud, MaximeGuo, ZHall, GeoffreyHarder, KristianHarper, SamIles, Gregory MichielInnocenti, Gian MicheleIves, Sarah JoanneJones, JohnKreis, Benjamin JonahLee, YLi, WLucas, ChristopherLucas, Robyn ElizabethMarrouche, JadNewbold, DavidNorthup, MichaelOljavo, IParamesvaran, SudarshanRivera, Ryan AllenRoland, ChristofRose, ASankey, DSmith, WesleySvetek, AlesTapper, AlexanderThea, AlessandroTikalsky, Jesra LilahUplegger, LorenzoVicente, MarceloWilliams, Thomas StephenWyslouch, BoleslawInstallation and Commissioning of the CMS Level-1 Calorimeter Trigger UpgradeDetectors and Experimental TechniquesThe Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for a fully upgraded CMS calorimeter trigger in operation by 2016.Solenoid (CMS) experiment is currently installing an upgrade to their Calorimeter Trigger to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised by these challenging conditions. The electronics will be upgraded in two stages. Stage-1 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before Stage-2 can be fully installed. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system, and require that the updates to the calorimeter back-ends, the source of the trigger primitives, are completed. The new systemâ??s boards will utilize Xilinx Virtex 7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of the stage-2 in 2015, for an fully upgraded CMS calorimeter trigger in operation by 2016.CMS-CR-2014-423oai:cds.cern.ch:20208742014-11-26
spellingShingle Detectors and Experimental Techniques
Klabbers, Pamela Renee
Aggleton, Robin Cameron
Baber, Mark David John
Barbieri, Richard Alexander
Belknap, Donald Austin
Berryhill, Jeffrey
Brooke, James John
Bundock, Aaron
Cali, Ivan Amos
Cepeda, Maria Luisa
Dasgupta, Sudeshna
da Silva, J.C
Dasu, Sridhara Rao
Durkin, Timothy John
Fobes, Robert William
Ghabrous Larrea, Carlos
Gorski, Thomas
Grimes, Mark
Guilbaud, Maxime
Guo, Z
Hall, Geoffrey
Harder, Kristian
Harper, Sam
Iles, Gregory Michiel
Innocenti, Gian Michele
Ives, Sarah Joanne
Jones, John
Kreis, Benjamin Jonah
Lee, Y
Li, W
Lucas, Christopher
Lucas, Robyn Elizabeth
Marrouche, Jad
Newbold, David
Northup, Michael
Oljavo, I
Paramesvaran, Sudarshan
Rivera, Ryan Allen
Roland, Christof
Rose, A
Sankey, D
Smith, Wesley
Svetek, Ales
Tapper, Alexander
Thea, Alessandro
Tikalsky, Jesra Lilah
Uplegger, Lorenzo
Vicente, Marcelo
Williams, Thomas Stephen
Wyslouch, Boleslaw
Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title_full Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title_fullStr Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title_full_unstemmed Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title_short Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade
title_sort installation and commissioning of the cms level-1 calorimeter trigger upgrade
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1109/NSSMIC.2014.7431124
http://cds.cern.ch/record/2020874
work_keys_str_mv AT klabberspamelarenee installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT aggletonrobincameron installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT babermarkdavidjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT barbieririchardalexander installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT belknapdonaldaustin installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT berryhilljeffrey installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT brookejamesjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT bundockaaron installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT caliivanamos installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT cepedamarialuisa installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT dasguptasudeshna installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT dasilvajc installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT dasusridhararao installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT durkintimothyjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT fobesrobertwilliam installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT ghabrouslarreacarlos installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT gorskithomas installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT grimesmark installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT guilbaudmaxime installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT guoz installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT hallgeoffrey installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT harderkristian installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT harpersam installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT ilesgregorymichiel installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT innocentigianmichele installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT ivessarahjoanne installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT jonesjohn installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT kreisbenjaminjonah installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT leey installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT liw installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT lucaschristopher installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT lucasrobynelizabeth installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT marrouchejad installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT newbolddavid installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT northupmichael installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT oljavoi installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT paramesvaransudarshan installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT riveraryanallen installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT rolandchristof installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT rosea installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT sankeyd installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT smithwesley installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT svetekales installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT tapperalexander installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT theaalessandro installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT tikalskyjesralilah installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT upleggerlorenzo installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT vicentemarcelo installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT williamsthomasstephen installationandcommissioningofthecmslevel1calorimetertriggerupgrade
AT wyslouchboleslaw installationandcommissioningofthecmslevel1calorimetertriggerupgrade