Cargando…
LHC(ATLAS, CMS, LHCb) Run 2 commissioning status
After a very successful run-1, the LHC accelerator and the LHC experiments had undergone intensive consolidation, maintenance and upgrade activities during the last 2 years in what has become known as Long-Shutdown-1 (LS1). LS1 ended in February this year, with beams back in the LHC since Easter. Th...
Autor principal: | Zimmermann, Stephanie |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2020910 |
Ejemplares similares
-
Preparation and commissioning of LHCb for the Run II of LHC
por: Puig Navarro, Albert
Publicado: (2016) -
Performance of the ATLAS Calorimeters and Commissioning for LHC Run-2
por: Rossetti, Valerio
Publicado: (2015) -
Preparation and Commissioning of ATLAS for the Run-II of LHC
por: Di Girolamo, Beniamino
Publicado: (2015) -
Commissioning of the upgraded ATLAS Pixel Detector for Run2 at LHC
por: Dobos, Daniel
Publicado: (2015) -
ATLAS LAr Calorimeter Performance and Commissioning for LHC Run-2
por: Spettel, Fabian
Publicado: (2015)