Cargando…
CMS Tracker Performance and Readiness for LHC Run II
The CMS Tracker performance during LHC Run I is reviewed. The latest results of both pixel and strip detectors following the first LHC long shutdown (LS1) are then presented. Results from detector calibration and commissioning, together with a description of operations and repairs done during LS1, w...
Autor principal: | Viliani, Lorenzo |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2015.09.046 http://cds.cern.ch/record/2027709 |
Ejemplares similares
-
Alignment of the CMS Tracker: Latest results from LHC Run-II
por: Mittag, Gregor
Publicado: (2017) -
The CMS inner tracker -- transition from LHC Run~I to Run~II and first experience of Run~II
por: Vormwald, Benedikt Roland
Publicado: (2015) -
Offline performance of the CMS Tracker during early Run II
por: Francois, Brieuc Arnaud L
Publicado: (2015) -
Experience in commissioning the CMS Silicon Tracker and readiness for LHC beams
por: Cole, Joanne
Publicado: (2008) -
Performance of CMS Tracker Alignment during LHC Run 2 and Commissioning towards Run 3
por: Pramod, Lakshmi
Publicado: (2022)