Cargando…
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges
Autores principales: | Salvachua, B, Bracco, C, Bruce, R, Chetvertkova, V, Ponce, L, Redaelli, S, Schmidt, R, Uythoven, J, Valentino, G, Wenninger, J, Wollmann, D, Zerlauth, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/ https://dx.doi.org/10.5170/CERN-2015-002.134 http://cds.cern.ch/record/2031197 |
Ejemplares similares
-
Commissioning and operation of the machine protection system
por: Ponce, L, et al.
Publicado: (2014) -
Machine Protection at the LHC – Experience of Three Years Running and Outlook for Operation at Nominal Energy
por: Wollmann, D, et al.
Publicado: (2013) -
Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
por: Wollmann, Daniel, et al.
Publicado: (2016) -
Machine Protection Challenges for HL-LHC
por: Schmidt, R, et al.
Publicado: (2014) -
Machine Protection Systems Performance And Issues 2012
por: Wollmann, D, et al.
Publicado: (2012)