Cargando…
Status Report of Projects Activities at CERN
Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2040172 |
_version_ | 1780947755727847424 |
---|---|
author | Missiaen, Dominique Dewitte, Philippe Dobers, Tobias Fuchs, Jean-Frederic Gayde, Jean-Christophe Jones, Mark Mainaud Durand, Helene |
author_facet | Missiaen, Dominique Dewitte, Philippe Dobers, Tobias Fuchs, Jean-Frederic Gayde, Jean-Christophe Jones, Mark Mainaud Durand, Helene |
author_sort | Missiaen, Dominique |
collection | CERN |
description | Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view. |
id | cern-2040172 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | cern-20401722019-09-30T06:29:59Zhttp://cds.cern.ch/record/2040172engMissiaen, DominiqueDewitte, PhilippeDobers, TobiasFuchs, Jean-FredericGayde, Jean-ChristopheJones, MarkMainaud Durand, HeleneStatus Report of Projects Activities at CERNAccelerators and Storage RingsBesides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.CERN-ACC-2015-0086oai:cds.cern.ch:20401722014-10-13 |
spellingShingle | Accelerators and Storage Rings Missiaen, Dominique Dewitte, Philippe Dobers, Tobias Fuchs, Jean-Frederic Gayde, Jean-Christophe Jones, Mark Mainaud Durand, Helene Status Report of Projects Activities at CERN |
title | Status Report of Projects Activities at CERN |
title_full | Status Report of Projects Activities at CERN |
title_fullStr | Status Report of Projects Activities at CERN |
title_full_unstemmed | Status Report of Projects Activities at CERN |
title_short | Status Report of Projects Activities at CERN |
title_sort | status report of projects activities at cern |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2040172 |
work_keys_str_mv | AT missiaendominique statusreportofprojectsactivitiesatcern AT dewittephilippe statusreportofprojectsactivitiesatcern AT doberstobias statusreportofprojectsactivitiesatcern AT fuchsjeanfrederic statusreportofprojectsactivitiesatcern AT gaydejeanchristophe statusreportofprojectsactivitiesatcern AT jonesmark statusreportofprojectsactivitiesatcern AT mainauddurandhelene statusreportofprojectsactivitiesatcern |