Cargando…

Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs

The aim of this MD is to quantify the impact of the stripline beam position monitor (BPM) directivity with two acquisition chain electronics systems, WBTN (Wide Band Time Normalizer) and DOROS (Diode ORbit and Oscillation System). This impact depends on the relative position and intensity of the two...

Descripción completa

Detalles Bibliográficos
Autores principales: Draskovic, Drasko, Lefevre, Thibaut, Calvo Giraldo, Eva, Olexa, Jakub, Gasior, Marek
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2056602
Descripción
Sumario:The aim of this MD is to quantify the impact of the stripline beam position monitor (BPM) directivity with two acquisition chain electronics systems, WBTN (Wide Band Time Normalizer) and DOROS (Diode ORbit and Oscillation System). This impact depends on the relative position and intensity of the two beams at the location of the monitor. This note explains all the procedures of the LHC MD 369, which took place on 20/07/2015 and presents the obtained results.