Cargando…

Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs

The aim of this MD is to quantify the impact of the stripline beam position monitor (BPM) directivity with two acquisition chain electronics systems, WBTN (Wide Band Time Normalizer) and DOROS (Diode ORbit and Oscillation System). This impact depends on the relative position and intensity of the two...

Descripción completa

Detalles Bibliográficos
Autores principales: Draskovic, Drasko, Lefevre, Thibaut, Calvo Giraldo, Eva, Olexa, Jakub, Gasior, Marek
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2056602
_version_ 1780948334824914944
author Draskovic, Drasko
Lefevre, Thibaut
Calvo Giraldo, Eva
Olexa, Jakub
Gasior, Marek
author_facet Draskovic, Drasko
Lefevre, Thibaut
Calvo Giraldo, Eva
Olexa, Jakub
Gasior, Marek
author_sort Draskovic, Drasko
collection CERN
description The aim of this MD is to quantify the impact of the stripline beam position monitor (BPM) directivity with two acquisition chain electronics systems, WBTN (Wide Band Time Normalizer) and DOROS (Diode ORbit and Oscillation System). This impact depends on the relative position and intensity of the two beams at the location of the monitor. This note explains all the procedures of the LHC MD 369, which took place on 20/07/2015 and presents the obtained results.
id cern-2056602
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling cern-20566022019-09-30T06:29:59Zhttp://cds.cern.ch/record/2056602engDraskovic, DraskoLefevre, ThibautCalvo Giraldo, EvaOlexa, JakubGasior, MarekSummary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMsAccelerators and Storage RingsAccelerators and Storage RingsThe aim of this MD is to quantify the impact of the stripline beam position monitor (BPM) directivity with two acquisition chain electronics systems, WBTN (Wide Band Time Normalizer) and DOROS (Diode ORbit and Oscillation System). This impact depends on the relative position and intensity of the two beams at the location of the monitor. This note explains all the procedures of the LHC MD 369, which took place on 20/07/2015 and presents the obtained results.CERN-ACC-NOTE-2015-0029oai:cds.cern.ch:20566022015-09-20
spellingShingle Accelerators and Storage Rings
Accelerators and Storage Rings
Draskovic, Drasko
Lefevre, Thibaut
Calvo Giraldo, Eva
Olexa, Jakub
Gasior, Marek
Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title_full Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title_fullStr Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title_full_unstemmed Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title_short Summary of LHC MD 369: DOROS vs WBTN in IR Stripline BPMs
title_sort summary of lhc md 369: doros vs wbtn in ir stripline bpms
topic Accelerators and Storage Rings
Accelerators and Storage Rings
url http://cds.cern.ch/record/2056602
work_keys_str_mv AT draskovicdrasko summaryoflhcmd369dorosvswbtninirstriplinebpms
AT lefevrethibaut summaryoflhcmd369dorosvswbtninirstriplinebpms
AT calvogiraldoeva summaryoflhcmd369dorosvswbtninirstriplinebpms
AT olexajakub summaryoflhcmd369dorosvswbtninirstriplinebpms
AT gasiormarek summaryoflhcmd369dorosvswbtninirstriplinebpms