Cargando…

The design and performance of the ATLAS Inner Detector trigger for Run 2

The design and performance of the ATLAS Inner Detector (ID) trigger algorithms running online on the High Level Trigger (HLT) processor farm with the early LHC Run 2 data are discussed. During the 2013-15 LHC shutdown, the HLT farm was redesigned to run in a single HLT stage, rather than the two-sta...

Descripción completa

Detalles Bibliográficos
Autor principal: Qin, Yang
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1134/S1547477116050472
http://cds.cern.ch/record/2061443
Descripción
Sumario:The design and performance of the ATLAS Inner Detector (ID) trigger algorithms running online on the High Level Trigger (HLT) processor farm with the early LHC Run 2 data are discussed. During the 2013-15 LHC shutdown, the HLT farm was redesigned to run in a single HLT stage, rather than the two-stage (Level 2 and Event Filter) used in Run 1. This allowed a redesign of the HLT ID tracking algorithms, essential for nearly all physics signatures in ATLAS. The redesign of the ID trigger, required in order to satisfy the challenging demands of the higher energy LHC Run 2 operation, is described. The detailed performance of the tracking algorithms with the initial Run 2 data is discussed, for the different physics signatures. This includes both the physics object reconstruction and timing performance for the algorithms running on the redesigned single stage ATLAS HLT Farm. Comparison with the Run 1 strategy is made and demonstrates the superior performance of the strategy adopted for Run 2.