Cargando…
The design and performance of the ATLAS Inner Detector trigger for Run 2
The design and performance of the ATLAS Inner Detector (ID) trigger algorithms running online on the High Level Trigger (HLT) processor farm with the early LHC Run 2 data are discussed. During the 2013-15 LHC shutdown, the HLT farm was redesigned to run in a single HLT stage, rather than the two-sta...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1134/S1547477116050472 http://cds.cern.ch/record/2061443 |