Cargando…
Beam dynamics and commissioning of low and medium energy H- beam at Linac4
The First step of the CERN Large Hadron Collider injectors upgrade (LIU) project is Linac4. It accelerates H- ions to 160 MeV in an 80 m long accelerator housed in a tunnel 12 m underground, presently under construction. It will replace the present 50 MeV proton Linac2 as injector of the proton acce...
Autor principal: | Satri, Masoomeh Yarmohammadi |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2063298 |
Ejemplares similares
-
Transverse Beam Profile Measurements in the Linac4 Medium Energy Beam Transport
por: Yarmohammadi Satri, Masoomeh, et al.
Publicado: (2014) -
Beam Commissioning of Linac4 up to 12 MeV
por: Dimov, Veliko, et al.
Publicado: (2015) -
Longitudinal Beam Profile Measurements in Linac4 Commissioning
por: Bellodi, Giulia, et al.
Publicado: (2014) -
Linac4 Transverse and Longitudinal Emittance Reconstruction in the Presence of Space Charge
por: Lallement, Jean-Baptiste, et al.
Publicado: (2014) -
Multiobjective genetic algorithm approach to optimize beam matching and beam transport in high-intensity hadron linacs
por: Yarmohammadi Satri, M, et al.
Publicado: (2019)