Cargando…
L1 calorimeter trigger upgrade: jet and energy sum performance and commissioning status
The performance and commissioning status of the Level-1 calorimeter trigger upgrade going online in 2016 is presented. Particular emphasis is placed on the performance of jet and energy sum algorithms.
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2063468 |
Ejemplares similares
-
Level-1 Jets and Sums Trigger Performance
por: CMS Collaboration
Publicado: (2016) -
Commissioning of the Jet/Energy-sum and Cluster Processors for the ATLAS Level-1 Calorimeter Trigger System
por: Achenbach, R, et al.
Publicado: (2007) -
Level-1 jets and energy sums trigger performance with full 2017 dataset
por: CMS Collaboration
Publicado: (2018) -
Level-1 jets and energy sums trigger performance with part of the 2017 dataset
por: CMS Collaboration
Publicado: (2017) -
L1 calorimeter trigger upgrade: tau performance
por: CMS Collaboration
Publicado: (2015)