Cargando…
The design and performance of the ATLAS Inner Detector trigger for Run-II
The design and performance of the ATLAS Inner Detector (ID) trigger algorithms running online on the high level trigger (HLT) processor farm with the early LHC Run 2 data are discussed. During the 2013-15 LHC shutdown, the HLT farm was redesigned to run in a single HLT stage, rather than the two-sta...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2065103 |