Cargando…
Commissioning and operating experience with the interaction rate and background monitors of the LEP e+e- collider
Autores principales: | Ferri, G, Glaser, M, Von Holtey, G, Lemeilleur, F |
---|---|
Lenguaje: | eng |
Publicado: |
1990
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/209857 |
Ejemplares similares
-
Commissioning and operating experience with the electrostatic beam separation system of the LEP e+e- collider
por: Kalbreier, Willi, et al.
Publicado: (1990) -
Silicon detectors used for beam diagnostics in the LEP collider
por: Ferri, G, et al.
Publicado: (1990) -
An interaction rate monitor for LEP
por: Hémery, J Y, et al.
Publicado: (1986) -
Particle Background at LEP with Head-On colliding Bunch Trains
por: Burkhardt, H, et al.
Publicado: (1996) -
Proposal for an interaction rate monitor at LEP
por: Von Holtey, G
Publicado: (1983)