Cargando…
Commissioning and operating experience with the electrostatic beam separation system of the LEP e+e- collider
Autores principales: | Kalbreier, Willi, Garrel, N, Laffin, M, Mertens, V, Rogner, G, Von Holtey, G |
---|---|
Lenguaje: | eng |
Publicado: |
1990
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/210129 |
Ejemplares similares
-
Layout, design and construction of the electrostatic separation system of the LEP e+e- collider
por: Kalbreier, Willi, et al.
Publicado: (1988) -
Computerized precision control of a synchronous high voltage discharge switch for the beam separation system of the LEP e$^{+}$/e$^{-}$ collider
por: Dieperink, J H, et al.
Publicado: (1990) -
Design and performance of a prototype synchronous high tension discharge switch for the separation system of the LEP e+e- collider
por: Keizer, Reinder L, et al.
Publicado: (1988) -
Modification of the LEP electrostatic separator systems for operation with bunch trains
por: Balhan, B, et al.
Publicado: (1995) -
First test of the electrostatic deflectors to be used for beam-team separation in LSS4 and LSS5
por: Dubois, R, et al.
Publicado: (1982)