Cargando…
The LHC machine: from beam commissioning to operation and future upgrades
This chapter describes the current status of the LHC. General machine parameters are reviewed and the beam commissioning process is presented, showing the evolution of the machine’s performance over recent years. The highlights of the powerful complex of injectors are described, in order to provide...
Autor principal: | Giovannozzi, Massimo |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1093/acprof:oso/9780198727965.003.0002 http://cds.cern.ch/record/2103622 |
Ejemplares similares
-
The CERN LHC machine: Current status and future upgrade plans
por: Giovannozzi, M
Publicado: (2013) -
Strategy for First Two Months of LHC Beam Commissioning (Commissioning to First Stable Beams)
por: Redaelli, S, et al.
Publicado: (2015) -
Electrical Circuits Required for the Minimum Workable LHC during Commissioning and first two years of Operation
por: Giovannozzi, Massimo
Publicado: (2006) -
LHC Commissioning and Operation Impact of Machine Protection
por: Schmidt, R
Publicado: (2001) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010)