Cargando…

DT Chamber Performance in 2015

The hit efficiency and the hit resolution of the CMS Drift Tube Chambers (DT) were measured with 2015 data and found to be comparable or better than in LHC Run 1 (2012). In addition, the implementation of the Mean Timer algorithm to reconstruct track segments provides an accurate measurement of the...

Descripción completa

Detalles Bibliográficos
Autor principal: CMS Collaboration
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2115432
Descripción
Sumario:The hit efficiency and the hit resolution of the CMS Drift Tube Chambers (DT) were measured with 2015 data and found to be comparable or better than in LHC Run 1 (2012). In addition, the implementation of the Mean Timer algorithm to reconstruct track segments provides an accurate measurement of the track crossing time, that is efficient for a few hundreds ns before and after the triggering bunch crossing.