Cargando…

Status of the R&D activities for the upgrade of the ALICE TPC

In order to cope with the high interaction rates provided by the LHC after the long shut-down 2, the ALICE TPC needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and $\textrm{d}E/\textrm{d}x$ resolution compared to the performance o...

Descripción completa

Detalles Bibliográficos
Autor principal: Deisting, Alexander
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1051/epjconf/201817401006
http://cds.cern.ch/record/2120606
_version_ 1780949330924929024
author Deisting, Alexander
author_facet Deisting, Alexander
author_sort Deisting, Alexander
collection CERN
description In order to cope with the high interaction rates provided by the LHC after the long shut-down 2, the ALICE TPC needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and $\textrm{d}E/\textrm{d}x$ resolution compared to the performance of the present TPC. Since readout by MWPCs is no longer feasible with these requirements, new technologies have to be employed. In the new readout the electron amplification is provided by a stack of four GEM foils. Here foils with a standard hole pitch of 140um as well as large pitch foils (280um) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of $\sigma_{{E}}/{E}\leq12\%$ at the photopeak of $^{55}\textrm{Fe}$. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation during the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEM stack the discharge probability is kept at the level of $10^{-12}$ . An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the $\textrm{d}E/\textrm{d}x$ performance of a full size readout chamber prototype was tested. In addition it is report on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.
id cern-2120606
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling cern-21206062023-03-14T19:35:25Zdoi:10.1051/epjconf/201817401006http://cds.cern.ch/record/2120606engDeisting, AlexanderStatus of the R&D activities for the upgrade of the ALICE TPCphysics.ins-detDetectors and Experimental TechniquesIn order to cope with the high interaction rates provided by the LHC after the long shut-down 2, the ALICE TPC needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and $\textrm{d}E/\textrm{d}x$ resolution compared to the performance of the present TPC. Since readout by MWPCs is no longer feasible with these requirements, new technologies have to be employed. In the new readout the electron amplification is provided by a stack of four GEM foils. Here foils with a standard hole pitch of 140um as well as large pitch foils (280um) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of $\sigma_{{E}}/{E}\leq12\%$ at the photopeak of $^{55}\textrm{Fe}$. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation during the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEM stack the discharge probability is kept at the level of $10^{-12}$ . An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the $\textrm{d}E/\textrm{d}x$ performance of a full size readout chamber prototype was tested. In addition it is report on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.After the Long Shutdown 2 (LS2) the LHC will provide lead–lead collisions at interaction rates as high as 50 kHz. In order to cope with such conditions the ALICE Time Projection Chamber (TPC) needs to be upgraded.After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and dE/dx resolution compared to the performance of the present TPC. Since readout by multi-wire proportional chambers is no longer feasible with these requirements, new technologies have to be employed. In the new readout chambers the electron amplification is provided by a stack of four Gas ElectronMultiplier (GEM) foils. Here foils with a standard hole pitch of 140 μm as well as large pitch foils (280 μm) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of σE/E ≤ 12% at the photopeak of 55Fe. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation at the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEMstack the discharge probability is kept at the level of 10-12 discharges per incoming hadron. An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the dE/dx performance of a full size readout chamber prototype was tested. In addition it is reported on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.After the Long Shutdown 2 the LHC will provide lead-lead collisions at interaction rates as high as 50kz. In order to cope with such conditions the ALICE Time Projection Chamber (TPC) needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and dE/dx resolution compared to the performance of the present TPC. Since readout by multi-wire proportional chambers is no longer feasible with these requirements, new technologies have to be employed. In the new readout chambers the electron amplification is provided by a stack of four Gas Electron Multiplier (GEM) foils. Their high voltage settings and orientation have been optimised to provide an energy resolution better then 12% at the photopeak of 55Fe. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation at the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEM stack the discharge probability is kept at the level of $10^{-12}$ discharges per incoming hadron. An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the dE/dx performance of a full size readout chamber prototype was tested. In addition it is reported on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.arXiv:1601.02183oai:cds.cern.ch:21206062016-01-10
spellingShingle physics.ins-det
Detectors and Experimental Techniques
Deisting, Alexander
Status of the R&D activities for the upgrade of the ALICE TPC
title Status of the R&D activities for the upgrade of the ALICE TPC
title_full Status of the R&D activities for the upgrade of the ALICE TPC
title_fullStr Status of the R&D activities for the upgrade of the ALICE TPC
title_full_unstemmed Status of the R&D activities for the upgrade of the ALICE TPC
title_short Status of the R&D activities for the upgrade of the ALICE TPC
title_sort status of the r&d activities for the upgrade of the alice tpc
topic physics.ins-det
Detectors and Experimental Techniques
url https://dx.doi.org/10.1051/epjconf/201817401006
http://cds.cern.ch/record/2120606
work_keys_str_mv AT deistingalexander statusoftherdactivitiesfortheupgradeofthealicetpc