Cargando…
MD 239 on Collide and Squeeze (part 2)
Colliding the beams during the squeeze to profit from Landau damping due to head--on beam-beam and beta--star leveling are two operational modes that may have to be used in a not so distant future at the LHC. This MD aimed at improving the orbit control during the squeeze with much improved handlin...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2124690 |
_version_ | 1780949578177052672 |
---|---|
author | Gorzawski, Arkadiusz Mirarchi, Daniele Salvachua Ferrando, Belen Maria Wenninger, Jorg |
author_facet | Gorzawski, Arkadiusz Mirarchi, Daniele Salvachua Ferrando, Belen Maria Wenninger, Jorg |
author_sort | Gorzawski, Arkadiusz |
collection | CERN |
description | Colliding the beams during the squeeze to profit from Landau damping due to head--on beam-beam and beta--star leveling are two operational modes that may have to be used in a not so distant future at the LHC. This MD aimed at improving the orbit control during the squeeze with much improved handling of orbit feedback references and at evaluating instruments and techniques to maintain the beam in collisions with active feedback on luminosity or beam position. This MD also integrated for the first time synchronized collimator measurements. Comparison of the settings with the previous MD allowed a validation of the long term stability of collide and squeeze. |
id | cern-2124690 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | cern-21246902019-09-30T06:29:59Zhttp://cds.cern.ch/record/2124690engGorzawski, ArkadiuszMirarchi, DanieleSalvachua Ferrando, Belen MariaWenninger, JorgMD 239 on Collide and Squeeze (part 2)Accelerators and Storage RingsColliding the beams during the squeeze to profit from Landau damping due to head--on beam-beam and beta--star leveling are two operational modes that may have to be used in a not so distant future at the LHC. This MD aimed at improving the orbit control during the squeeze with much improved handling of orbit feedback references and at evaluating instruments and techniques to maintain the beam in collisions with active feedback on luminosity or beam position. This MD also integrated for the first time synchronized collimator measurements. Comparison of the settings with the previous MD allowed a validation of the long term stability of collide and squeeze.CERN-ACC-NOTE-2016-0018oai:cds.cern.ch:21246902016-01-18 |
spellingShingle | Accelerators and Storage Rings Gorzawski, Arkadiusz Mirarchi, Daniele Salvachua Ferrando, Belen Maria Wenninger, Jorg MD 239 on Collide and Squeeze (part 2) |
title | MD 239 on Collide and Squeeze (part 2) |
title_full | MD 239 on Collide and Squeeze (part 2) |
title_fullStr | MD 239 on Collide and Squeeze (part 2) |
title_full_unstemmed | MD 239 on Collide and Squeeze (part 2) |
title_short | MD 239 on Collide and Squeeze (part 2) |
title_sort | md 239 on collide and squeeze (part 2) |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2124690 |
work_keys_str_mv | AT gorzawskiarkadiusz md239oncollideandsqueezepart2 AT mirarchidaniele md239oncollideandsqueezepart2 AT salvachuaferrandobelenmaria md239oncollideandsqueezepart2 AT wenningerjorg md239oncollideandsqueezepart2 |