Cargando…
Linac3 LEBT beam measurements during the 2014-2015 Argon ion run
Between Spring 2014 and Spring 2015, LINAC3 delivered a beam of Argon ions. A campaign of beam studies was launched with the aim of better understanding the present limitations in the machine performance in the framework of the requested intensity goals as defined by the LHC Injectors Upgrade projec...
Autores principales: | Bellodi, Giulia, Lombardi, Alessandra, Maintrot, Marc, Toivanen, Ville Aleksi |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2129048 |
Ejemplares similares
-
The 2017 Xe run at CERN Linac3: measurements and beam dynamics simulations
por: Benedetti, Stefano, et al.
Publicado: (2018) -
Performances of the LEBT of the CERN lead ion Linac
por: Lombardi, A M, et al.
Publicado: (1995) -
Upgrade of the beam extraction system of the GTS-LHC electron cyclotron resonance ion source at CERN
por: Toivanen, V, et al.
Publicado: (2016) -
Simulation of the CERN GTS-LHC ECR ion source extraction system with lead and argon ion beams
por: Toivanen, V, et al.
Publicado: (2014) -
Recent Developments with the GTS-LHC ECR Ion Source at CERN
por: Toivanen, Ville, et al.
Publicado: (2017)