Cargando…

Implications for operations

The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the stan...

Descripción completa

Detalles Bibliográficos
Autores principales: Arduini, G, Lamont, M, Pieloni, T, Rumolo, G
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1142/9789814675475_0022
http://cds.cern.ch/record/2131862
Descripción
Sumario:The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the standard operational year, together with a discussion of fault time is presented. The potential performance is then explored and estimates of the required machine availability and efficiency for 250 fb−1 per year are given. Finally the e-cloud challenges, scrubbing runs requirements, and machine development potential are outlined.