Cargando…
Implications for operations
The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the stan...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1142/9789814675475_0022 http://cds.cern.ch/record/2131862 |
_version_ | 1780949826924445696 |
---|---|
author | Arduini, G Lamont, M Pieloni, T Rumolo, G |
author_facet | Arduini, G Lamont, M Pieloni, T Rumolo, G |
author_sort | Arduini, G |
collection | CERN |
description | The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the standard operational year, together with a discussion of fault time is presented. The potential performance is then explored and estimates of the required machine availability and efficiency for 250 fb−1 per year are given. Finally the e-cloud challenges, scrubbing runs requirements, and machine development potential are outlined. |
id | cern-2131862 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | cern-21318622022-08-10T12:56:20Zdoi:10.1142/9789814675475_0022http://cds.cern.ch/record/2131862engArduini, GLamont, MPieloni, TRumolo, GImplications for operationsAccelerators and Storage RingsThe HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the standard operational year, together with a discussion of fault time is presented. The potential performance is then explored and estimates of the required machine availability and efficiency for 250 fb−1 per year are given. Finally the e-cloud challenges, scrubbing runs requirements, and machine development potential are outlined.oai:cds.cern.ch:21318622015 |
spellingShingle | Accelerators and Storage Rings Arduini, G Lamont, M Pieloni, T Rumolo, G Implications for operations |
title | Implications for operations |
title_full | Implications for operations |
title_fullStr | Implications for operations |
title_full_unstemmed | Implications for operations |
title_short | Implications for operations |
title_sort | implications for operations |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1142/9789814675475_0022 http://cds.cern.ch/record/2131862 |
work_keys_str_mv | AT arduinig implicationsforoperations AT lamontm implicationsforoperations AT pielonit implicationsforoperations AT rumolog implicationsforoperations |