Cargando…
Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer
The Monitored Drift Tube (MDT) chambers for the muon spectrometer of the AT- LAS detector at the Large Hadron Collider (LHC) consist of 3-4 layers of pressurized drift tubes on either side of a space frame carrying an optical monitoring system to correct for deformations. The full-scale prototype of...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0168-9002(00)01156-6 http://cds.cern.ch/record/2145043 |
_version_ | 1780950294564175872 |
---|---|
author | Bauer, F. Bratzler, U. Dietl, H. Kroha, H. Lagouri, Th. Manz, A. Ostapchuk, A. Richter, Robert Schael, S. Chouridou, S. Deile, M. Kortner, O. Staude, A. Stroehmer, R. Trefzger, T. |
author_facet | Bauer, F. Bratzler, U. Dietl, H. Kroha, H. Lagouri, Th. Manz, A. Ostapchuk, A. Richter, Robert Schael, S. Chouridou, S. Deile, M. Kortner, O. Staude, A. Stroehmer, R. Trefzger, T. |
author_sort | Bauer, F. |
collection | CERN |
description | The Monitored Drift Tube (MDT) chambers for the muon spectrometer of the AT- LAS detector at the Large Hadron Collider (LHC) consist of 3-4 layers of pressurized drift tubes on either side of a space frame carrying an optical monitoring system to correct for deformations. The full-scale prototype of a large MDT chamber has been constructed with methods suitable for large-scale production. X-ray measurements at CERN showed a positioning accuracy of the sense wires in the chamber of better than the required 20 ?microns (rms). The performance of the chamber was studied in a muon beam at CERN. Chamber production for ATLAS now has started. |
id | cern-2145043 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | cern-21450432021-05-03T20:30:41Zdoi:10.1016/S0168-9002(00)01156-6http://cds.cern.ch/record/2145043engBauer, F.Bratzler, U.Dietl, H.Kroha, H.Lagouri, Th.Manz, A.Ostapchuk, A.Richter, RobertSchael, S.Chouridou, S.Deile, M.Kortner, O.Staude, A.Stroehmer, R.Trefzger, T.Construction and Test of MDT Chambers for the ATLAS Muon SpectrometerDetectors and Experimental TechniquesThe Monitored Drift Tube (MDT) chambers for the muon spectrometer of the AT- LAS detector at the Large Hadron Collider (LHC) consist of 3-4 layers of pressurized drift tubes on either side of a space frame carrying an optical monitoring system to correct for deformations. The full-scale prototype of a large MDT chamber has been constructed with methods suitable for large-scale production. X-ray measurements at CERN showed a positioning accuracy of the sense wires in the chamber of better than the required 20 ?microns (rms). The performance of the chamber was studied in a muon beam at CERN. Chamber production for ATLAS now has started.The Monitored Drift Tube (MDT) chambers for the muon spectrometer of the AT- LAS detector at the Large Hadron Collider (LHC) consist of 3-4 layers of pressurized drift tubes on either side of a space frame carrying an optical monitoring system to correct for deformations. The full-scale prototype of a large MDT chamber has been constructed with methods suitable for large-scale production. X-ray measurements at CERN showed a positioning accuracy of the sense wires in the chamber of better than the required 20 ?microns (rms). The performance of the chamber was studied in a muon beam at CERN. Chamber production for ATLAS now has started.The Monitored Drift Tube (MDT) chambers for the muon spectrometer of the ATLAS detector at the Large Hadron Collider (LHC) consist of 3–4 layers of pressurized drift tubes on either side of a space frame carrying an optical monitoring system to correct deformations. The full-scale prototype of a large MDT chamber has been constructed with methods suitable for large-scale production. X-ray measurements at CERN showed a positioning accuracy of the sense wires in the chamber of better than the required 20 μm (rms). The performance of the chamber was studied in a muon beam at CERN. Chamber production for ATLAS now has started.MPP-2016-071arXiv:1604.02000MPI-PHE-2000-11MPP-2016-071MPI-PHE-2000-11oai:cds.cern.ch:21450432016-04-07 |
spellingShingle | Detectors and Experimental Techniques Bauer, F. Bratzler, U. Dietl, H. Kroha, H. Lagouri, Th. Manz, A. Ostapchuk, A. Richter, Robert Schael, S. Chouridou, S. Deile, M. Kortner, O. Staude, A. Stroehmer, R. Trefzger, T. Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title | Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title_full | Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title_fullStr | Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title_full_unstemmed | Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title_short | Construction and Test of MDT Chambers for the ATLAS Muon Spectrometer |
title_sort | construction and test of mdt chambers for the atlas muon spectrometer |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1016/S0168-9002(00)01156-6 http://cds.cern.ch/record/2145043 |
work_keys_str_mv | AT bauerf constructionandtestofmdtchambersfortheatlasmuonspectrometer AT bratzleru constructionandtestofmdtchambersfortheatlasmuonspectrometer AT dietlh constructionandtestofmdtchambersfortheatlasmuonspectrometer AT krohah constructionandtestofmdtchambersfortheatlasmuonspectrometer AT lagourith constructionandtestofmdtchambersfortheatlasmuonspectrometer AT manza constructionandtestofmdtchambersfortheatlasmuonspectrometer AT ostapchuka constructionandtestofmdtchambersfortheatlasmuonspectrometer AT richterrobert constructionandtestofmdtchambersfortheatlasmuonspectrometer AT schaels constructionandtestofmdtchambersfortheatlasmuonspectrometer AT chouridous constructionandtestofmdtchambersfortheatlasmuonspectrometer AT deilem constructionandtestofmdtchambersfortheatlasmuonspectrometer AT kortnero constructionandtestofmdtchambersfortheatlasmuonspectrometer AT staudea constructionandtestofmdtchambersfortheatlasmuonspectrometer AT stroehmerr constructionandtestofmdtchambersfortheatlasmuonspectrometer AT trefzgert constructionandtestofmdtchambersfortheatlasmuonspectrometer |