A new cryogenic test facility for large superconducting devices at CERN
To expand CERN testing capability to superconducting devices that cannot be installed in existing test facilities because of their size and/or mass, CERN is building a new cryogenic test facility for large and heavy devices. The first devices to be tested in the facility will be the S-FRS supercondu...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/101/1/012185 http://cds.cern.ch/record/2145995 |
_version_ | 1780950327327981568 |
---|---|
author | Perin, A Derking, J H Serio, L Stewart, L Benda, V Bremer, J Pirotte, O |
author_facet | Perin, A Derking, J H Serio, L Stewart, L Benda, V Bremer, J Pirotte, O |
author_sort | Perin, A |
collection | CERN |
description | To expand CERN testing capability to superconducting devices that cannot be installed in existing test facilities because of their size and/or mass, CERN is building a new cryogenic test facility for large and heavy devices. The first devices to be tested in the facility will be the S-FRS superconducting magnets for the FAIR project that is currently under construction at the GSI Research Center in Darmstadt, Germany. The facility will include a renovated cold box with 1.2 kW at 4.5 K equivalent power with its compression system, two independent 15 kW liquid nitrogen precooling and warm-up units, as well as a dedicated cryogenic distribution system providing cooling power to three independent test benches. The article presents the main input parameters and constraints used to define the cryogenic system and its infrastructure. The chosen layout and configuration of the facility is presented and the characteristics of the main components are described. |
id | cern-2145995 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | cern-21459952022-08-10T13:08:05Zdoi:10.1088/1757-899X/101/1/012185http://cds.cern.ch/record/2145995engPerin, ADerking, J HSerio, LStewart, LBenda, VBremer, JPirotte, OA new cryogenic test facility for large superconducting devices at CERNEngineeringTo expand CERN testing capability to superconducting devices that cannot be installed in existing test facilities because of their size and/or mass, CERN is building a new cryogenic test facility for large and heavy devices. The first devices to be tested in the facility will be the S-FRS superconducting magnets for the FAIR project that is currently under construction at the GSI Research Center in Darmstadt, Germany. The facility will include a renovated cold box with 1.2 kW at 4.5 K equivalent power with its compression system, two independent 15 kW liquid nitrogen precooling and warm-up units, as well as a dedicated cryogenic distribution system providing cooling power to three independent test benches. The article presents the main input parameters and constraints used to define the cryogenic system and its infrastructure. The chosen layout and configuration of the facility is presented and the characteristics of the main components are described.oai:cds.cern.ch:21459952015 |
spellingShingle | Engineering Perin, A Derking, J H Serio, L Stewart, L Benda, V Bremer, J Pirotte, O A new cryogenic test facility for large superconducting devices at CERN |
title | A new cryogenic test facility for large superconducting devices at CERN |
title_full | A new cryogenic test facility for large superconducting devices at CERN |
title_fullStr | A new cryogenic test facility for large superconducting devices at CERN |
title_full_unstemmed | A new cryogenic test facility for large superconducting devices at CERN |
title_short | A new cryogenic test facility for large superconducting devices at CERN |
title_sort | new cryogenic test facility for large superconducting devices at cern |
topic | Engineering |
url | https://dx.doi.org/10.1088/1757-899X/101/1/012185 http://cds.cern.ch/record/2145995 |
work_keys_str_mv | AT perina anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT derkingjh anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT seriol anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT stewartl anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT bendav anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT bremerj anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT pirotteo anewcryogenictestfacilityforlargesuperconductingdevicesatcern AT perina newcryogenictestfacilityforlargesuperconductingdevicesatcern AT derkingjh newcryogenictestfacilityforlargesuperconductingdevicesatcern AT seriol newcryogenictestfacilityforlargesuperconductingdevicesatcern AT stewartl newcryogenictestfacilityforlargesuperconductingdevicesatcern AT bendav newcryogenictestfacilityforlargesuperconductingdevicesatcern AT bremerj newcryogenictestfacilityforlargesuperconductingdevicesatcern AT pirotteo newcryogenictestfacilityforlargesuperconductingdevicesatcern |