Stochastic project networks: temporal analysis, scheduling and cost minimization

Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide v...

Descripción completa

Detalles Bibliográficos
Autor principal: Neumann, Klaus
Lenguaje:eng
Publicado: Springer 1990
Materias:
Acceso en línea:https://dx.doi.org/10.1007/978-3-642-61515-3
http://cds.cern.ch/record/2146593
_version_ 1780950366714593280
author Neumann, Klaus
author_facet Neumann, Klaus
author_sort Neumann, Klaus
collection CERN
description Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
id cern-2146593
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1990
publisher Springer
record_format invenio
spelling cern-21465932021-04-21T19:43:20Zdoi:10.1007/978-3-642-61515-3http://cds.cern.ch/record/2146593engNeumann, KlausStochastic project networks: temporal analysis, scheduling and cost minimizationMathematical Physics and MathematicsProject planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.Springeroai:cds.cern.ch:21465931990
spellingShingle Mathematical Physics and Mathematics
Neumann, Klaus
Stochastic project networks: temporal analysis, scheduling and cost minimization
title Stochastic project networks: temporal analysis, scheduling and cost minimization
title_full Stochastic project networks: temporal analysis, scheduling and cost minimization
title_fullStr Stochastic project networks: temporal analysis, scheduling and cost minimization
title_full_unstemmed Stochastic project networks: temporal analysis, scheduling and cost minimization
title_short Stochastic project networks: temporal analysis, scheduling and cost minimization
title_sort stochastic project networks: temporal analysis, scheduling and cost minimization
topic Mathematical Physics and Mathematics
url https://dx.doi.org/10.1007/978-3-642-61515-3
http://cds.cern.ch/record/2146593
work_keys_str_mv AT neumannklaus stochasticprojectnetworkstemporalanalysisschedulingandcostminimization