Cargando…
First stable beams 2016
Preparations continue for the upcoming physics run : The first low-intensity stable beams have been declared in the LHC following the restart in March 2016
Autor principal: | Fichet, Jacques Herve |
---|---|
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2148038 |
Ejemplares similares
-
Beamline for Schools 2016
por: Chemli, Hugo Maxime, et al.
Publicado: (2016) -
CMS beam pipe installation
por: Fichet, Jacques Herve
Publicado: (2021) -
Beams screens for the High-Luminosity LHC
por: Fichet, Jacques Herve
Publicado: (2023) -
Upgraded LHC beam dump transport in the LHC tunnel
por: Fichet, Jacques Herve
Publicado: (2020) -
Last shrink fitting operation of the Run 3 LHC beam dump spares
por: Fichet, Jacques Herve
Publicado: (2023)