Cargando…
The first cable for the HL-LHC produced at CERN
A Rutherford cabling machine is operated in the superconducting laboratory in building 163. The machine was used for the production of the Nb-Ti cables in the LHC magnets. Today, it is operated for the assembly of the high-performance cables, made from state-of-the-art Nb$_{3}$Sn conductor, for the...
Autor principal: | |
---|---|
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2149942 |
Sumario: | A Rutherford cabling machine is operated in the superconducting laboratory in building 163. The machine was used for the production of the Nb-Ti cables in the LHC magnets. Today, it is operated for the assembly of the high-performance cables, made from state-of-the-art Nb$_{3}$Sn conductor, for the LHC High Luminosity Upgrade. Key elements of the machine are of a precision Turkshead equipped with a variable power drive, a caterpillar, a dimensional control bench, a data acquisition system, and a take-up unit. The video shows the production of a long length Rutherford cable, made from 40 Nb$_{3}$Sn strands, that will be use in a 11 T LHC High Luminosity dipole magnet. The wiring machine is the only one left in Europe able to do such a job. |
---|