Cargando…
The first cable for the HL-LHC produced at CERN
A Rutherford cabling machine is operated in the superconducting laboratory in building 163. The machine was used for the production of the Nb-Ti cables in the LHC magnets. Today, it is operated for the assembly of the high-performance cables, made from state-of-the-art Nb$_{3}$Sn conductor, for the...
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2149942 |
Ejemplares similares
-
CERN CRAB cavity HL-LHC
por: Brice, Maximilien, et al.
Publicado: (2017) -
Installation of the first MKI for the HL-LHC
por: Brice, Maximilien
Publicado: (2023) -
HL LHC work on first magnet prototype
por: Brice, Maximilien
Publicado: (2016) -
HL-LHC (High-Luminosity LHC) first stone ceremony June 2018
por: Brice, Maximilien, et al.
Publicado: (2018) -
HL LHC insertion into cryostat
por: Brice, Maximilien
Publicado: (2016)